Extruder kerbs can be used to form an extruded kerb beam for when mortar bedding is required.
Outputs of up to 400m per day can be achieved on a well prepared site.This significantly reduces the time and labour compared with using standard shuttering.
Using an extruded kerb beam allows clients to surface their roads before laying kerbs. Kerbs can then be installed at a later date once construction works have eased, reducing the need for replacing damaged kerbs during construction.