Working closely with our clients and contractors, we are dedicated to deliver an excellent service on all of our projects.

GALLERY

Hochtief logo

A23 CoulsdonConsisted of the installation of 7km of kerbs/edgings. 2km2 Paving.

Bexhill to Hastings link road: Installation of 5km of HB2 kerbs.

Ardleigh Green bridge: 1500m kerb.

Alfred McAlpine logo

A30 Bodmin to Queens BypassConsisted of the installation of 11km of combined kerb & edgings.

Carillion logo

A27 Southerham to beddingham BypassInstallation of 9km of kerbs&edgings.

Abberton Reservoir Scheme: Installation of 40km of pcc edgings, 4km pcc kerbs 20km2 topsoil works. 2km timber footpath full construction.1km of envrio kerb.

A40 Western Avenue Bridges Replacement: Installation of 4km2 of paving slabs/blockpaving. 6km of pcc kerbs/edgings.

A23 Handscross to Warninglid Widening : Installation of 26km of drainage kerb, hb2 kerbs, sp kerbs, edgings.

A5-M1 Link 32km kerbing.

Skanska logo

A2 Pepperhill to Cobham Widening Scheme: Installation of 12km of kerbs. 900m2 chevron paving. 1.5km2 grasscrete.

DLR Station Refurbishment: 600m of coping stone. 1km2 paving works tactile&slab all laid on steintec mortar.

Breheny Civil Engineering logo

Eureka Park Section 278 Works: : 2km of pcc kerbs.

Bewbush junction improvments : 1.4km beany blocks. 3km splay kerbs, 3km edgings, 1km of conservation kerbs

Colchester Northern Approches: 5km of Beany Blocks, 4.5km of kerbs, 6km of edgings 

Bexhill Link Rd : 15km Kerbing.

Runwell Infrastructure: 9km Kerbing.

Clacton on Sea: 5km kerbing

Marham Park: 6km kerbing

Colchester sports ground: 6km kerbing

Little Hampton link rd:15km drainage kerb.

Romney Marsh Academy: 6km kerbs.

Berewood Western Link Rd: 8km conservation kerb.

IPM Infrastructure works, Southern site: 3km kerbs. Beaulieu Radial Distributor: 7km kerbs.

Herne Relief Road: 9km kerbs. 7km kerbs/edgings.

Volker Fitzpatrick logo

Thanet Earth Access Road: Insalltion of 6km of pcc kerbs/edgings.

ROH Production Park: Installaion of 4km of granite kerbs&edgings.

Ashford Traincare Facility: Installation of 1km of bridge deck kerbs.

Victoria Way Initial Phase Ashford: Installation of 2km2 of Chinese granite setts all laid on steintec motar, 7km of granite kerbs. 1km of beany block.

East Kent Access Phase 2: Installation of 27km of kerbs&edgings. 2km2 grasscrete. 700m2 chevron paving. 1km beany block.

A45 Birmingham Corridor improvments: Installation of 14km of hb2 & splay kerbs. 2km, Aco channel, 6km, edgings.

M275 Tipner: Installation of 500m Max E channel, 1.2km enviro kerb, 3.5km hb2 kerbs.

DP World Port Access Road: Installation of 7km Hb2 Kerbs & Bullnose kerbs.

DP World Port Access Road Phase 2: 5km of Aco installed, 4km of timber edging, 7km of splay kerbs, 7km of edgings.

DP World Port Access Road Phase 3: 4km of Aco, 5km of HB2 kerbs, 4km of edgings.

Lewisham Gateway Projects: Small civils package including granite kerbing & york stone paving.

Chesterton Slidings: 12km kerbing.

Cranfeild Universitiy: 15km kerbing.

A27 NMU: 12km edgings.

Blackwell logo

Cheesemans Green Link Road: 2.5km of enviro kerb, 3km of HB kerb, 2500 m2 of block paving.

Barton Park: 12km Kerbing – 6km2 block paving. 

Bam Nuttall logo

M20 Jct 9 Drovers Roundabout: Installation of 6km of kerbs&edgings. 1.5km2 of grasscrete paving.

Euro Tunnel lot 2: 1.2km of Trief kerb, 1km of Aco, 3km of PCC kerbs.

Peters Village: 40km kerbing – 20km2 block paving.

M25 Jct 2: 400m drainage kerb.

London Bridge English heritage: 400m oringinal London granite kerbs.

Newhaven port access road: 5km HB2 kerbs.

Thanet Park Way: 6km kerbs / 7000m2 block paving/slabs.

Costain logo

A5 – M1 Link: 32k kerbing.

Hammersmith flyover: 700m bridge deck kerb.

A30 Chiverton to Carland Cross: 26km kerbs.

Jackson Civil Engineering logo

Hamersmith Flyover: 1.5km of enviro deck, 1km of Trief kerb.

Rugby Radio: 20km kerbing.

Swanswell Viaduct: 2km Bridge deck drain kerb.

Dover 278 works: 5km kerbing.

Greenhithe: 3km kerbing. 

Maidstone High Street Refurb: Granite sett paving. 

Whitfield S38 Works: 5km Kerbing. 

A2300: 8km kerbs. 

WBLR:  2km kerbs.

North Camp: 4km kerbs.

Lyminster Bypass: 6km kerbs.

Cala Homes, Long Stanton: 4km kerbs.

A14 Integrated Delivery Team logo

A14 Section 04 & 05: 75km kerbing.

Balfour - Costain - Skanska JV: Section 06 - 5km kerbing.

Gallagher logo

Kings Hill S38 Works: 5km kerbing.

Chilmington Green: 8km kerbing.

Dover Leisure: 2km2 block paving.

Inland port: 18km kerbing.

Pannatoni Park: 8km kerbs. 6000m2 block paving.

Southall Waterside: 5km Granite kerbing. 5km2 Conservation paving.

Heybridge: 6km kerbs.

Euro Tunnel: 5km kerbs/treif kerb.

Ashford, 278 works: 2km kerbs/tactiles.

Dover high street refurbishment: 2000m2 of block paving.

Balfour Beatty logo

A21 tonbridge to pembury bypass: 16km kerbing.

A43 Moulton. Bypass : 12km kerbing

A2: 16km kerbs/drainage kerb.

M25 Jct 10: 23km kerbs.

SISK Builders Contractors logo

M20 Jct 7 bridge refurb: 1.5km kerbing.

Gatwick virgin hanger: 5km2 block paving - 6km kerbing.

Northstowe: 16km kerbing - 2km2 block paving, 1km2 Yorkstone paving, 12km timber edgings.

Burgess Hill S38 works: 6km kerb/edgings. 1.5km ducting.

A12 concrete roads: 8km kerbs. 7km NFD install.

M25: 6km kerbs.

M11 Jct 7: 12km kerbs.

M2 Jct 5: 8km kerbs.

Boreham interchange: 7km kerbs/tactiles/pavings.

A120 Little Hadham Bypass: 4km kerbs.

Dover Fast track: 11km kerbs/edgings.

All documentation for the above contracts available upon request.