All documentation for the above contracts available upon request.
A23 Coulsdon: Consisted of the installation of 7km of kerbs/edgings. 2km2 Paving.
Bexhill to Hastings link road: Installation of 5km of HB2 kerbs.
Ardleigh Green bridge: 1500m kerb.
A30 Bodmin to Queens Bypass: Consisted of the installation of 11km of combined kerb & edgings.
A27 Southerham to beddingham Bypass: Installation of 9km of kerbs&edgings.
Abberton Reservoir Scheme: Installation of 40km of pcc edgings, 4km pcc kerbs 20km2 topsoil works. 2km timber footpath full construction.1km of envrio kerb.
A40 Western Avenue Bridges Replacement: Installation of 4km2 of paving slabs/blockpaving. 6km of pcc kerbs/edgings.
A23 Handscross to Warninglid Widening : Installation of 26km of drainage kerb, hb2 kerbs, sp kerbs, edgings.
A5-M1 Link – 32km kerbing.
A2 Pepperhill to Cobham Widening Scheme: Installation of 12km of kerbs. 900m2 chevron paving. 1.5km2 grasscrete.
DLR Station Refurbishment: 600m of coping stone. 1km2 paving works tactile&slab all laid on steintec mortar.
Eureka Park Section 278 Works: : 2km of pcc kerbs.
Bewbush junction improvments : 1.4km beany blocks. 3km splay kerbs, 3km edgings, 1km of conservation kerbs
Colchester Northern Approches: 5km of Beany Blocks, 4.5km of kerbs, 6km of edgings
Bexhill Link Rd : 15km Kerbing.
Runwell Infrastructure: 9km Kerbing.
Clacton on Sea: 5km kerbing
Marham Park: 6km kerbing
Colchester sports ground: 6km kerbing
Little Hampton link rd:15km drainage kerb.
Romney Marsh Academy: 6km kerbs.
Berewood Western Link Rd: 8km conservation kerb.
IPM Infrastructure works, Southern site: 3km kerbs. Beaulieu Radial Distributor: 7km kerbs.
Herne Relief Road: 9km kerbs. 7km kerbs/edgings.
Thanet Earth Access Road: Insalltion of 6km of pcc kerbs/edgings.
ROH Production Park: Installaion of 4km of granite kerbs&edgings.
Ashford Traincare Facility: Installation of 1km of bridge deck kerbs.
Victoria Way Initial Phase Ashford: Installation of 2km2 of Chinese granite setts all laid on steintec motar, 7km of granite kerbs. 1km of beany block.
East Kent Access Phase 2: Installation of 27km of kerbs&edgings. 2km2 grasscrete. 700m2 chevron paving. 1km beany block.
A45 Birmingham Corridor improvments: Installation of 14km of hb2 & splay kerbs. 2km, Aco channel, 6km, edgings.
M275 Tipner: Installation of 500m Max E channel, 1.2km enviro kerb, 3.5km hb2 kerbs.
DP World Port Access Road: Installation of 7km Hb2 Kerbs & Bullnose kerbs.
DP World Port Access Road Phase 2: 5km of Aco installed, 4km of timber edging, 7km of splay kerbs, 7km of edgings.
DP World Port Access Road Phase 3: 4km of Aco, 5km of HB2 kerbs, 4km of edgings.
Lewisham Gateway Projects: Small civils package including granite kerbing & york stone paving.
Chesterton Slidings: 12km kerbing.
Cranfeild Universitiy: 15km kerbing.
A27 NMU: 12km edgings.
Cheesemans Green Link Road: 2.5km of enviro kerb, 3km of HB kerb, 2500 m2 of block paving.
Barton Park: 12km Kerbing – 6km2 block paving.
M20 Jct 9 Drovers Roundabout: Installation of 6km of kerbs&edgings. 1.5km2 of grasscrete paving.
Euro Tunnel lot 2: 1.2km of Trief kerb, 1km of Aco, 3km of PCC kerbs.
Peters Village: 40km kerbing – 20km2 block paving.
M25 Jct 2: 400m drainage kerb.
London Bridge English heritage: 400m oringinal London granite kerbs.
Newhaven port access road: 5km HB2 kerbs.
Thanet Park Way: 6km kerbs / 7000m2 block paving/slabs.
A5 – M1 Link: 32k kerbing.
Hammersmith flyover: 700m bridge deck kerb.
A30 Chiverton to Carland Cross: 26km kerbs.
Hamersmith Flyover: 1.5km of enviro deck, 1km of Trief kerb.
Rugby Radio: 20km kerbing.
Swanswell Viaduct: 2km Bridge deck drain kerb.
Dover 278 works: 5km kerbing.
Greenhithe: 3km kerbing.
Maidstone High Street Refurb: Granite sett paving.
Whitfield S38 Works: 5km Kerbing.
A2300: 8km kerbs.
WBLR: 2km kerbs.
North Camp: 4km kerbs.
Lyminster Bypass: 6km kerbs.
Cala Homes, Long Stanton: 4km kerbs.
A14 Section 04 & 05: 75km kerbing.
Balfour - Costain - Skanska JV: Section 06 - 5km kerbing.
Kings Hill S38 Works: 5km kerbing.
Chilmington Green: 8km kerbing.
Dover Leisure: 2km2 block paving.
Inland port: 18km kerbing.
Pannatoni Park: 8km kerbs. 6000m2 block paving.
Southall Waterside: 5km Granite kerbing. 5km2 Conservation paving.
Heybridge: 6km kerbs.
Euro Tunnel: 5km kerbs/treif kerb.
Ashford, 278 works: 2km kerbs/tactiles.
Dover high street refurbishment: 2000m2 of block paving.
A21 tonbridge to pembury bypass: 16km kerbing.
A43 Moulton. Bypass : 12km kerbing
A2: 16km kerbs/drainage kerb.
M25 Jct 10: 23km kerbs.
M20 Jct 7 bridge refurb: 1.5km kerbing.
Gatwick virgin hanger: 5km2 block paving - 6km kerbing.
Northstowe: 16km kerbing - 2km2 block paving, 1km2 Yorkstone paving, 12km timber edgings.
Burgess Hill S38 works: 6km kerb/edgings. 1.5km ducting.
A12 concrete roads: 8km kerbs. 7km NFD install.
M25: 6km kerbs. M11 Jct 7: 12km kerbs. M2 Jct 5: 8km kerbs. Boreham interchange: 7km kerbs/tactiles/pavings. A120 Little Hadham Bypass: 4km kerbs.
Dover Fast track: 11km kerbs/edgings.
All documentation for the above contracts available upon request.